UPS NEWARK AIRPORT GATEWAY
PROJECT HIGHLIGHTS
The Port Authority of NY & NJ is in the midst of the largest design-build project in New Jersey’s history: The Newark Liberty International Airport Terminal One Redevelopment Program. In order to accommodate the new terminal, it was necessary for UPS to relocate its operations across the airport property and construct a new state of the art receiving and distribution air cargo facility. Due to our vast experience in site work and aeronautical pavement and our expertise in constructing fast-track projects, Crisdel was selected by Structure Tone to construct all of the site improvements and airside concrete pavement to compliment the new facility.
Major Work Items: Removal of existing asphalt Aircraft Aprons (50,000 SY); Removal of existing Air Operations Area Security Fence and Barrier and Installation of new Air Operations Temporary Security Fence and Barrier; Removal of existing underground utilities including electrical and communication duct banks; Removal of existing sanitary sewer; Relocation of 12″ High Pressure Fire Protection Main (2,000 LF); Relocation of 24″ High Pressure Transmission Water Main (1,000 LF); Install 25,000 LF of various size drainage lines ranging from 12″ – 42″ diameter and approximately 100 precast drainage structures; Construct 1,700 LF of Aircraft Rated Cast-in Place Concrete Trench Drains; Install two Underground Detention Basins providing 200,000 CF of storm water storage; Install 13 Precast Water Quality Drainage Structures; Install 2,000 LF of Sanitary Sewer and associated manholes; Perform site excavation, grading and building pad preparation (30,000 CY); Perform all MEP excavation in building and throughout site; Fine grading for various pavement sections (70,000 SY); Concrete paving for Aircraft Aprons and Loading Dock Area (35,000 CY); Construct asphalt employee parking lot (10,000 SY, including curbs and sidewalks); Construct permanent Air Operations Security Fence and Barrier (2,000 LF); and Perform roadway widening, signage and striping on existing roadways for site access.