Celgene’s Summit Campus is undergoing major renovations to their existing buildings. Crisdel Group was contracted by Turner Construction to disconnect all existing utilities to the buildings that were to be demolished. Underground tunnels interconnected the campus buildings. Prior to demolition, Crisdel excavated and removed these concrete tunnels. Crisdel also re-routed the existing fire lines to accommodate the new building footprints.